Complete flight school management software

Modernize and streamline flight training management and operations. Designed to comply with EASA FCL and FAA regulations.

Free plan forever · 30-day Premium trial · no credit card, no demo, no sales call

Currently on Flylogs

  • 600Companies
  • 960Aircraft
  • 159,002Flights logged
  • 5,264Pilots
Student training progress in Flylogs, lesson by lesson

One platform from enrolment to skill test

Flylogs is an online service that helps modernize and streamline flight training management and operations in pilot schools worldwide. Designed to comply with EASA FCL and FAA AC 61-65e, AC 120-78 and Part 61 guidelines. Give your flight instructors the best tool to boost efficiency — improve student communication and satisfaction.

  • Designed to comply with EASA FCL and FAA AC 61-65e
  • Distance and on-site training course management
  • Student progress tracking and flight missions
  • Online tests and multimedia content
  • Complete flight schedule planner
  • Pilot duty time and flight time monitoring
  • Student billing and payment tracking
  • Aircraft, FI and student digital logbooks

Flight schools and ATOs already running on Flylogs

From two-aircraft clubs to approved training organisations across Europe, Africa and the Americas.

See it in action

Short guides recorded in Flylogs itself. What you see is exactly what your team will use.

Flylogs at a glance1:24 · Watch on YouTube

Training courses and classes

Enjoy the benefits of using an ATO-specific tool for all your pilot e-learning needs. Manage training courses, subjects and classes, and make class handouts — including multimedia content — available to students online. Make it easy for teachers to set up online remote classes and track class attendance.

Start Free Trial →
Ground school class with handouts and attendance in Flylogs

Flights and ground school scheduling

Flylogs allows flight schools and ATOs to schedule both flights and theoretical classes easily. Use the Flylogs Smart Calendar to double-check instructor, student and aircraft availability. When needed, use the option to ask pilots to confirm the proposed flights. Have full visibility of scheduled flights, flights pending confirmation and canceled flights for the upcoming week and month.

Start Free Trial →
Flight and classroom scheduling calendar in Flylogs

Student progress tracking and attendance

Keep track of class attendance, exam results and flight training progress. On each student's profile, both students and instructors will find a snapshot of all flight missions and exercises that have been completed or are pending completion.

Start Free Trial →
Cohort progress report across students and syllabus items

Student billing

Ensure flight hours and tuition fees are billed to students correctly and in a timely manner. Flylogs has a specific tool for accountants to keep track of billed flights and transfer data easily into your accounting system. Students can also keep track of their pending bills from their own profile.

Start Free Trial →
Student billing and payment records in Flylogs

Everything else your school runs on

Student evaluation and exams

Teachers can schedule exams and record students' grades, which appear on each individual student profile. After a training flight, instructors easily track which flight exercises the student completed and evaluate their performance during each exercise — even on the go from a mobile device.

Documentation and SMS

Publish internal and public documents for pilots and students. Check read receipts and upload new versions of the same document. A complete SMS system is embedded into Flylogs — encourage your team to be proactive by giving them the option to create online safety reports directly from any flight.

Unlimited flight data storage

All your flights are safely stored in Flylogs. Complete flight time statistics and Excel download option. Different pilot level accounts with login and contact information. Pilot documentation and automatic expiration alerts keep your records always current.

Take Flylogs mobile

Native iOS & Android apps for your crew — always-on access to schedules, flight data, documents and safety reports.

Explore mobile apps

Built for the records your authority asks for

Whichever regime you are approved under, the requirement is the same: produce the record, show it hasn't been altered, and say which manual applied at the time. Flylogs is built for both.

EASA — ATOs and DTOs

  • ORA.GEN.220 record traceability
  • ORA.ATO.120 training records
  • Approved course and syllabus mapping
  • Head of Training oversight
  • Instructor and examiner privileges
  • Training manual version control
  • ORA.GEN.160 occurrence reporting
  • Licence and medical expiry alerts
  • EASA-format logbook export

FAA — Part 141 schools

  • Immutable audit trail
  • Digital signatures
  • Curriculum / TCO mapping
  • Stage check workflows
  • Chief Instructor approvals
  • Instructor currency tracking
  • Graduation certificate generation
  • Student record retention controls
  • FAA audit export package
960+
Aircraft Managed
159,002
Flights Recorded
5,264+
Pilots Active
30
Day Free Trial

Your data is always safe with us

Flylogs stores your data encrypted in private servers, performing 4 daily backups.

Simple, transparent pricing

Subscriptions are billed annually. We also offer paid support plans and migration services.

Club Essentials
690€/yr
Start 30-day Trial
Unlimited
2490€/yr
Start 30-day Trial
See full pricing and plan limits →

Frequently asked questions

Is Flylogs suitable for a small flight school?

Yes. Schools with two aircraft and schools with thirty run on the same platform — the difference is which modules you turn on. The free tier exists precisely so a small school can start without a budget conversation.

Does it work for both EASA and FAA operations?

Yes, and for schools operating under both. Courses, records and duty tracking are configured per organisation, so an ATO in Europe and a Part 141 school in the United States each get the structure their authority expects. The comparison table further down this page shows where the two regimes line up.

Can we manage ground school as well as flying?

Yes. Classes, subjects, handouts, multimedia content, attendance and online exams are part of the same course as the flight lessons, not a separate system.

What happens to our existing training records?

Aircraft, people and historical flight data can be imported. Most schools keep the old records archived and start clean records in Flylogs from a chosen date, which keeps the audit trail unambiguous.

Does it work offline?

Yes. Instructors and students can log flights and file safety reports from the mobile apps without a connection, and everything syncs when they're back in range.

How does Flylogs compare to FlightLogger, Aviatize or Flight Schedule Pro?

The main differences are scope and how you buy. Flylogs covers scheduling, training records, safety management, maintenance and billing in one system rather than as separate products, and you can start on a free tier without a demo. Detailed comparisons are on our comparison pages.

Does Flylogs help with an SMS?

Yes, and this is where the two regimes differ most. EASA requires a management system including safety management under ORA.GEN.200; the FAA does not impose an SMS requirement on Part 141 schools. Flylogs provides confidential occurrence reporting, ICAO risk-matrix scoring, corrective actions and Annex 19 classification either way.

Can we run more than one airfield?

Yes. Each base can have its own aircraft, instructors and operating hours while the fleet and training records stay shared — the equivalent of what §141.91 calls a satellite base.

How long does it take to get running?

Creating an account and scheduling a first flight takes minutes. Building your approved courses properly takes longer and is worth doing carefully — that structure is what makes the records useful later.

Most flight schools don't run one system. They run a scheduler for the bookings, a spreadsheet for student progress, a shared drive for the manuals, a second spreadsheet for instructor hours, and an accounting tool that never quite matches what was actually flown.

It works, until an authority asks for a student's complete training file and someone spends two days assembling it from four places.

Flylogs is one platform for the whole operation: bookings, training records, student progress, exams, duty time, documentation, safety reporting and billing, all against the same aircraft and the same people. Built for EASA ATOs and DTOs and for FAA Part 61 and Part 141 schools, with a free tier you can start on today without talking to anyone.

What's in the platform

Training courses and classes
Build your approved courses as they're written: subjects, lessons, syllabus items and the class handouts that go with them. Students see the course, their position in it, and what's next.
Flight and ground school scheduling
One planner for aircraft, instructors and classes, with the conflicts caught at booking time rather than on the morning of the flight.
Student progress and attendance
Every lesson graded against the syllabus, every class attended or missed, visible per student and across the cohort — so a student falling behind shows up in week three rather than at the skill test.
Exams and evaluation
Online tests with multimedia, marked automatically and filed to the student's record alongside the lessons they follow.
Digital logbooks
Aircraft, instructor and student logbooks written from the same flight, so the three can't disagree, with EASA-format export when you need it on paper.
Duty and flight time
Instructor hours tracked continuously against rolling limits, with alerts before a limit is reached rather than after.
Documentation
Manuals and bulletins distributed with read tracking and version control, so you can show who has seen the current revision and when.
Safety management
Confidential occurrence reporting with ICAO risk-matrix scoring, corrective actions and Annex 19 classification. Reports can be filed from a phone, offline, if the ramp has no signal.
Maintenance
Airworthiness status by hours, cycles and calendar, attached to each aircraft and visible to whoever is about to book it.
Multiple bases
Several airfields from one account, each with its own aircraft, instructors and operating hours, while the fleet and the training records stay shared.
Billing
Confirm a flight and its billing record is raised automatically, at the right rate for that student, drawing down prepaid hour packages as it goes.
Mobile
Native iOS and Android apps for instructors and students, working offline and syncing when they're back in range.

Billing that happens when the flight is confirmed

Schools lose money in the gap between flying and invoicing — the lesson nobody logged, the rate applied from memory, the month reconciled from a spreadsheet three weeks late. Flylogs closes that gap by making billing a consequence of confirming the flight rather than a separate job at month end.

  1. 01
    The flight is flown.

    Times are captured once, against the aircraft, the crew and the booking — no separate billing entry to key in afterwards.

  2. 02
    The flight is confirmed.

    Confirmation is the trigger. The moment a flight moves to confirmed, Flylogs raises its billing record automatically — you are not remembering to bill anything.

  3. 03
    The rate is chosen for you.

    Flylogs selects the applicable rate from the aircraft, the flight type and the billing profile of the person flying, then itemises flight time, taxes, fuel, handling and any extras.

  4. 04
    You check it, or you don't.

    Every value stays editable before it is saved, so an unusual trip can be adjusted. Everything else simply goes through.

Per-student rates

A student on a package pays their rate, a club member pays theirs, and the correct one is applied without anyone choosing it.

Prepaid hour packages

Students prepay blocks of hours at an agreed rate. Flylogs picks the right package per flight, draws the hours down, and tracks the balance and expiry in real time.

Instructor time

Instruction is billed alongside the aircraft on the same record, from the same flight, rather than reconstructed from a diary.

Itemised and adjustable

Flight, taxes, fuel, handling and extras broken out separately, all editable before saving.

Statements per student

A full billing history per student, so the answer to "what do I owe" is one screen rather than an afternoon.

Status you can see

Pending, invoiced and paid across every student and aircraft, filterable by person, aircraft, date or status, and exportable to Excel for your accounts.

Rates, VAT and currency are configured once per aircraft and flight type. After that, the month's invoicing is a review rather than a rebuild.

Records that survive an audit

Regulators don't ask whether you have the data. They ask whether you can produce it, show it hasn't been altered, and say which version of the manual applied at the time. The two regimes ask for the same thing in different words — so here is each requirement with its counterpart alongside it.

EASA — ATOs and DTOs

ORA.GEN.220 Record-keeping requires a system giving adequate storage and reliable traceability of all activities, with records protected from damage, alteration and theft. ORA.ATO.120 Record-keeping adds the training records themselves. Flylogs holds training records against the student, the course and the instructor, with change history, so traceability isn't something you reconstruct afterwards.

FAA — Part 141 schools

14 CFR §141.101 Training records requires the date the student was enrolled, a chronological log of course attendance, subjects and flight operations covered, the names and grades of any tests taken, and the date the student graduated, terminated or transferred — kept at least one year afterwards. That is the shape of a Flylogs student record, produced as a single export.

Retention periods and the exact records required vary by authority and by course. Flylogs applies no automatic deletion, so the platform is never the reason a record isn't there when an inspector asks for it.

What the rules ask for, and how Flylogs covers it

Every requirement below is one we built the product against, with the European rule and its United States counterpart side by side. If you operate under both regimes — or plan to — this is the map, and the last column is what the platform does about it.

What it coversEASA — Part-ORAFAA — 14 CFRHow Flylogs covers it
Scope of the approval
ORA.ATO.100 ScopeORA.ATO.105 Application
Part 141 Subpart A — General
Courses, aircraft and instructors are configured per organisation, so what the system allows is the scope you were approved for.
Management and quality system
ORA.GEN.200 Management system
§141.83 Quality of training
Safety reporting, document control and record change history in one system, so the evidence for the management system is a by-product of daily use.
Named post holders
ORA.GEN.210 Personnel requirementsORA.ATO.110 Personnel requirements
§141.33 Personnel§141.35 Chief instructor qualifications§141.36 Assistant chief instructor qualifications§141.37 Check instructor qualifications
Roles and permissions per person, with instructor and examiner privileges recorded against the individual.
Responsibilities of the head of training
ORA.ATO.110 Personnel requirements
§141.85 Chief instructor responsibilities§141.87 Change of chief instructor
The head of training sees cohort progress, instructor loading and every grade without asking anyone for a report.
Facilities and briefing areas
ORA.GEN.215 Facility requirements
§141.43 Pilot briefing areas§141.45 Ground training facilities
Ground school classes are scheduled as their own sessions, with attendance recorded against each one.
Aerodromes and operating sites
ORA.ATO.140 Aerodromes and operating sites
§141.38 Airports
Each base carries its own aircraft, instructors and operating hours while the fleet stays shared.
Aircraft and simulators used for training
ORA.ATO.135 Training aircraft and FSTDs
§141.39 Aircraft§141.41 Full flight simulators, flight training devices, aviation training devices, and training aids
Airworthiness tracked by hours, cycles and calendar, with an unfit aircraft blocked from dispatch rather than flagged afterwards.
The approved course itself
ORA.ATO.125 Training programmeORA.ATO.225 Training programme
Part 141 Subpart C — Training Course Outline and Curriculum
Subjects, lessons and syllabus items are built as the course is approved, and student progression follows them.
Manuals
ORA.ATO.130 Training manual and operations manual
Part 141 Subpart C — Training Course Outline and Curriculum
Manuals and revisions distributed with read tracking and version history, so you can show who saw which revision and when.
Taking a student on
ORA.ATO.145 Pre-requisites for training
§141.93 Enrollment
Enrolment date, prerequisites and licence and medical validity are recorded at the point of enrolment.
Classroom instruction
ORA.ATO.305 Classroom instruction
§141.81 Ground training
Ground school classes with handouts, multimedia content and attendance taken against the class.
Flight instruction
ORA.ATO.125 Training programme
§141.79 Flight training
Every lesson is graded against its syllabus item, and the flight lands in the aircraft, instructor and student logs together.
Training records
ORA.GEN.220 Record-keepingORA.ATO.120 Record-keeping
§141.101 Training records
One student record — enrolment, lessons, grades, attendance, exams, expiries — produced as a single export.
Completion of the course
ORA.ATO.125 Training programme
§141.95 Graduation certificate
Course completion is recorded against the student with the full training history behind it.
Additional locations
ORA.ATO.140 Aerodromes and operating sites
§141.91 Satellite bases
Additional airfields run from the same account as one organisation.
Keeping equipment serviceable
ORA.GEN.215 Facility requirements
§141.89 Maintenance of personnel, facilities, and equipment
Maintenance plans, defect reports and MEL items attached to each aircraft and visible before booking.
Changes to the organisation
ORA.GEN.130 Changes to organisationsORA.GEN.135 Continued validity
§141.87 Change of chief instructor§141.91 Satellite bases
Records and documents carry change history, and role changes are tracked per person.
Findings and corrective action
ORA.GEN.150 FindingsORA.GEN.155 Immediate reaction to a safety problem
§141.83 Quality of training
Findings carry corrective actions with an owner and a due date, tracked to closure.
Occurrence and safety reporting
ORA.GEN.160 Occurrence reporting
No Part 141 equivalent — see 14 CFR Part 5 (SMS) and the FAA ASRS
Confidential occurrence reporting with ICAO risk-matrix scoring and Annex 19 classification, filed from a phone if needed.

EASA references follow the consolidated Annex VII (Part-ORA) to the Aircrew Regulation; FAA references follow 14 CFR Part 141 as published on eCFR. Safety management is the clearest asymmetry: EASA requires a management system including safety management under ORA.GEN.200, while the FAA does not impose an SMS requirement on Part 141 schools. Rules are amended — confirm current text with your authority before relying on this table for a compliance decision. Flylogs is software, not an approval: the organisation holds the certificate and remains responsible for compliance. What we commit to is that the records, evidence and alerting each rule expects are there when an inspector asks.

Start free, and no, there's no sales call

You can create an account, add your aircraft and schedule your first flight today. The free tier is a real tier, not a countdown — small schools and clubs run on it. When you outgrow it, pricing is published and you upgrade yourself.

Bringing an existing operation across: import your aircraft and people, build your courses as they're approved, and run the new system alongside the old one before you switch. Keeping the historical records archived and starting clean records in Flylogs from a chosen date keeps the audit trail unambiguous.

Start your flight school on Flylogs — free plan, no card required.Create free account